Showing posts with label Airport. Show all posts
Showing posts with label Airport. Show all posts

Friday, January 4, 2013

Pondicherry Airport Flights Schedule and Ticket Prices #PNY #Pondicherry

Finally Pondicherry gets air connected with 5 major cities. Starting 17th January 2013, fly direct from Pondicherry to Bengaluru. Passengers could also fly to Delhi, Kolkata, Mumbai and Hyderabad from Pondicherry via Bangalore.

The schedule of 50-minute-long travel is: Pondicherry (Departure) -13.30 and Bangalore (arrival) - 14.20, Bangalore (Departure) - 12.20 and Pondicherry (arrival) - 13.10. The tickets are priced for Pondicherry to Bangalore at Rs 3193 and from Bangalore to Pondicherry at Rs 3445. Round trip is priced at Rs 6638.
Advance booking for Pondicherry to Bangalore would cost passengers around Rs 2668 (one or two months before journey) and around Rs 2920 for Bangalore to Pondicherry.



Wednesday, June 27, 2012

Skydiving Tandem and Solo Camp at Pondicherry from 29th June to 8th July 2012



If as a child you ever dreamt of flying like a bird, here's your chance to do it. Skydiving is a have it all experience that defies words. It is for those who have discipline, focus and the nerve to conquer fear. It is the closest you can get to nirvana, as in the realm of clueless consciousness, yet alert.


Calendar
29th June Static camp 1
0800 h: All students Arrive Pondicherry Air base
Introduction to sky diving, Training for static line jumpers
30th June 0700 – 1600h: Refresher /doubt clearing session followed by exam
1st July Static line Jumps
2nd July to
4th July
Static line Jumps
5th July Static camp 2
0800 h: All students Arrive Pondicherry Air base
Introduction to sky diving, Training for static line jumpers
6th July 0700 – 1600h: Refresher /doubt clearing session followed by examStatic line Jumps
7th July Static line Jumps
8th July Static line Jumps

Schedule:

Static Line Jump:

Day 1: 0800 to 1800hrs - Introduction to sky diving, Training for static line jumpers
Day 2: 0700 to 1600hrs - Refresher /doubt clearing session followed by exam & Static Jump (In case of bad whether or any other issues, your jump will be scheduled on next day)



Tandem Jumps:
Day 1 : 1400 to 1600hrs - Training for Tandem Jump
Day 2 : 0700 to 1000hrs - Briefing and Tandem Jump (In case of bad whether or any other issues, your jump will be scheduled on next day)



Charges per participant:
TYPE OF JUMP CHARGES
Static jump course with one jump 18,000/-
Static jump course with two jump 31000/-
Static jump course with three jumps 40,000/-
Static jump course with five jumps 62,000/-
Tandem 27000/-


Above charges includes: Ground training, Jump, Service tax.
Above charges does not include: Transport to and from Pondicherry Airbase, Food, Accommodation.



Pre-requisites:
  • You need to be reasonably physically fit and need to get a medical certificate of fitness form a general medical practitioner.
  • You will also be signing an indemnity bond before you jump.
  • You will have to be below 90 kg in weight and should have no history of high BP, cardiac problems or serious back injuries.
  • Atleast 16yrs for Static and 18 yrs for tandem jump.

Talk to us before you signup! Email at team@bmcindia.org or call on 9902027262



Friday, March 2, 2012

Pondicherry Airport is expected to start operations from August 2012


Source: Deccan Chronicle

With a new terminal building expected to be ready by August this year, the Puducherry airport is all set for a makeover. While there are no scheduled flights to this Union Territory(UT), airport authorities plan to facilitate airline operators to fly ATR type aircraft.

Presently un-scheduled flights, helicopter operations and flying clubs operate this airport. “The Rs. 30 crore new terminal building that can accommodate 150 passengers at a time will be opened by August this year,” said Airports Authority of India (AAI) southern region executive director D. Devaraj. Noting that no airline has filed for any operations from Puducherry airport, he said the AAI has made the airport ready for ATR operations.

“The present runway length is 1,503 metres and it is enough to operate ATR type aircraft,” he said, adding that there are no constraints for airlines to start operations right away as the old terminal building is available for passenger movement.

However, Mr Devaraj noted that bigger aircrafts like Airbus 320 and Boeing 737 can’t be operated from Puducherry airport unless the runway length is extended to a minimum of 2,200 metres. “As per our master plan, we have asked for 436 acres of land to increase the runway length to cater to operations of bigger aircraft,” he added.

Due to runway length constraint, Puducherry airport that can be reached in just 10 minutes by air from Chennai cannot handle flights that have been diverted from Chennai because of bad weather conditions.

When contacted, Puducherry welfare minister P. Rajavelu told DC that the UT has sought the help of the Tamil Nadu for acquiring 200 acres of land at both ends of the runway.

“The land at both ends of the runway comes under the territorial limits of TN. So we have started a dialogue with TN government and in a recent communication, the TN government has asked us to send exact requirements,” he said.

Airlines game to operate from Pondicherry airport soon
Airline companies are interested in operating from Puducherry airport. A Puducherry government source said Air India, Jet Airways and Kingfisher have expressed their interest in operating from Puducherry.

“The companies have accepted to depute technical experts to study the feasibility of operating flights from the Union Territory to various destinations in the country”, the source added.

While noting that Puducherry has a good potential to attract a large number of tourists particularly from France who can land directly in the Union Territory instead of other locations, state tourism director A. S. Sivakumar said the congestion at Chennai airport would get eased when Puducherry airport becomes operational. He noted that about 80,000 tourists visit Puducherry between April and August every year.

Mr Sivakumar further noted that it is advantageous for private carriers to fly to Puducherry, as the VAT on aviation turbine fuel is only 1.5 per cent in Puducherry compared to 15 per cent in TN.

“Puducherry is turning into an industrial hub with chemical factories, medical and engineering colleges and consumer industry base. So the need for air travel is bound to improve in the coming days,” said Air Passengers Association of India (APAI) president D. Sudhakara Reddy.

A frequent flyer, Mr Reddy said Puducherry is already a tourist destination and so it will be viable to operate long distance flights to and fro the Union Territory.

When contacted, a Jet Airways spokesperson said the airline company would look at operating flights from Puducherry only after AAI completes the development works at the airport there.

Wednesday, September 7, 2011

Pondicherry airport to go on stream in October 2011

Source: Business Line

The Puducherry (Pondicherry) airport will go on stream from October 10 with SpiceJet Airlines operating an ATR flight to Bangalore, the Welfare and Tourism Minister, Mr P. Rajavelu, told the territorial Assembly on Sept 3.

The airline had obtained clearance from the Civil Aviation Ministry to operate the flight, he said in response to a query by Mr P. Karthikeyan (AINRC).

Air India, Jet Airways and Kingfishers had also informed that they would depute their technical team to study feasibility of operating flights from Puducherry to other destinations.

Airport expansion

Giving details of the progress of work in the airport at Lawspet near here, he said a memorandum of understanding was signed between the Puducherry Administration and the Airports Authority of India in June 2007 for expansion of the airport in two phases.
Under Phase-I, extension of existing runway by 260 metres was taken up to enable landing of ATR type of aircraft along with ground support facilities. An extent of 19.92 hectares within Puducherry State limits was acquired for the purpose at Rs 18.95 crore and handed over to AAI in July 2007.

Phase-II comprised extension of an additional 1,100 meters of runway by acquiring 200 acres in neighbouring Tamil Nadu State limits to operate large jet aircraft.

The runway length, which was earlier 1,222 metres, had now been extended to 1,482 metres, he said.

AAI had completed the runway and facilities for night landing of aircraft. A terminal building, which could handle 300 passengers, was now under construction and is expected to be completed by the end of this year

Monday, May 2, 2011

Air Hostess Training School in Pondicherry

"Heart School of Air Hostess" is a Air Hostess training school in Pondicherry offers courses like Diploma in Airline, Toursim & Hospitality Management and Airline Ticketing, which is affiliated to Punjab Technical University, Jalandhar.

Contact details:
Heart School of Air Hostess
No.104, Kamatchi Amman Koil Street,
(Near M.G. Road) Pondicherry - 605 001.
Ph: 0413 2228833, 2226008, 2222996
Mobile: 99946 94111